The US just returned to the Moon after more than 50 years. How big a deal is it, really?

In the few short years since the COVID pandemic changed our world, China, Japan and India have all successfully landed on the Moon.

Many more robotic missions have flown past the Moon, entered lunar orbit, or crashed into it in the past five years. This includes spacecraft developed by South Korea, the United Arab Emirates, and an Israeli not-for-profit organisation.

Late last week, the American company Intuitive Machines, in collaboration with NASA, celebrated “America’s return to the Moon” with a successful landing of its Odysseus spacecraft.

Recent Chinese-built sample return missions are far more complex than this project. And didn’t NASA ferry a dozen humans to the Moon back when microwaves were cutting-edge technology? So what is different about this mission developed by a US company?

Back to the Moon

The recent Odysseus landing stands out for two reasons. For starters, this is the first time a US-built spacecraft has landed – not crashed – on the Moon for over 50 years.

Secondly, and far more significantly, this is the first time a private company has pulled off a successful delivery of cargo to the Moon’s surface.

NASA has lately focused on destinations beyond the Earth–Moon system, including Mars. But with its Commercial Lunar Payload Services (CLPS) program, it has also funded US private industry to develop Moon landing concepts, hoping to reduce the delivery costs of lunar payloads and allow NASA engineers to focus on other challenges.

Working with NASA, Intuitive Machines selected a landing site about 300 kilometres from the lunar south pole. Among other challenges, landing here requires entering a polar orbit around the Moon, which consumes additional fuel.

At this latitude, the land is heavily cratered and dotted with long shadows. This makes it challenging for autonomous landing systems to find a safe spot for a touchdown.

NASA spent about US$118 million (A$180 million) to land six scientific payloads on Odysseus. This is relatively cheap. Using low-cost lunar landers, NASA will have an efficient way to test new space hardware that may then be flown on other Moon missions or farther afield.

Ten minutes of silence

One of the technology tests on the Odysseus lander, NASA’s Navigation Doppler Lidar experiment or NDL, appears to have proved crucial to the lander’s success.

As the lander neared the surface, the company realised its navigation systems had a problem. NASA’s NDL experiment is serendipitously designed to test precision landing techniques for future missions. It seems that at the last second, engineers bodged together a solution that involved feeding necessary data from NDL to the lander.

Ten minutes of silence followed before a weak signal was detected from Odysseus. Applause thundered through the mission control room. NASA’s administrator released a video congratulating everyone for returning America to the Moon.

It has since become clear the lander is not oriented perfectly upright. The solar panels are generating sufficient power and the team is slowly receiving the first images from the surface.

However, it’s likely Odysseus partially toppled over upon landing. Fortunately, at the time of writing, it seems most of the science payload may yet be deployed as it’s on the side of the lander facing upwards. The unlucky payload element facing downwards is a privately contributed artwork connected to NFTs.

The lander is now likely to survive for at least a week before the Sun sets on the landing site and a dark, frigid lunar night turns it into another museum piece of human technology frozen in the lunar regolith.

The Moon visible 10km beneath the Odysseus lander after it entered lunar orbit on February 21. Intuitive Machines, CC BY-NC-ND

Win some, lose some

NASA’s commercial approach to stimulating low-cost payload services all but guarantees some failures. But eventually NASA hopes that several commercial launch and landing providers will emerge from the program, along with a few learning experiences.

The know-how accumulated at organisations operating hardware in space is at least as important as the development of the hardware itself.

The market for commercial lunar payloads remains unclear. Possibly, once the novelty wears off and brands are no longer able to generate buzz by, for example, sending a piece of outdoor clothing to the Moon, this source of funding may dwindle.

However, just as today, civil space agencies and taxpayers will continue to fund space exploration to address shared science goals.

Ideally, commercial providers will offer NASA an efficient method for testing key technologies needed for its schedule of upcoming scientific robotic missions, as well as human spaceflight in the Artemis program. Australia would also have the opportunity to test hardware at a reduced price.

It’s worth noting that US budgetary issues, funding cuts and subsequent lay-offs do threaten these ambitions.

Meanwhile, in Australia, we may have nothing to launch anyway. We continue to spend less than the OECD average on scientific research, and only a few Australian universities – who traditionally lead such efforts – have received funding provided by the Australian Space Agency.

If we do support planetary science and space exploration in the future, Australians will need to decide if we want to allocate our limited resources, competing with NASA and US private industry, to supply launch, landing and robotic services to the global space industry.

Alternatively, we could leverage these lower-cost payload providers to develop our own scientific space program, and locally developed space technologies associated with benefits to the knowledge economy, education and national security.The Conversation

David Flannery, Planetary Scientist, Queensland University of Technology

This article is republished from The Conversation under a Creative Commons license. Read the original article.

Read More........

NASA scrubs launch of giant Moon rocket, may try again Friday

NASA scrubs launch of giant Moon rocket, may try again Friday
NASA has scrubbed a test flight of its powerful new rocket, in a setback to its plan to send humans back to the Moon and eventually to Mars, but may shoot for another launch attempt on Friday. "We don't launch until it's right," NASA administrator Bill Nelson said after an engine issue forced a cancellation of Monday's flight from the Kennedy Space Center in Florida. "This is a very complicated machine," Nelson said. "You don't want to light the candle until it's ready to go." The goal of the mission, baptized Artemis 1 after the twin sister of Apollo, is to test the 322-foot (98-meter) Space Launch System (SLS) rocket and Orion crew capsule that sits on top. The mission is uncrewed -- mannequins equipped with sensors are standing in for astronauts and will record acceleration, vibration and radiation levels. Mike Sarafin, mission manager of Artemis 1, said the space agency is hoping to make another launch attempt later this week. "Friday is definitely in play," Sarafin said. NASA would have a better idea of whether a Friday launch is feasible after a meeting on Tuesday of the management team, he said. "We just need a little bit of time to look at the data," Sarafin said. Next Monday, September 5, is an alternative launch date. Blastoff had been planned for 8:33 am (1233 GMT) but was cancelled because a test to get one of the rocket's four RS-25 engines to the proper temperature range for launch was not successful. Delays are "part of the space business," Nelson said, expressing confidence NASA engineers will "get it fixed and then we'll fly." Tens of thousands of people -- including US Vice President Kamala Harris -- had gathered to watch the launch, which comes 50 years after Apollo 17 astronauts last set foot on the Moon. "Our commitment to the Artemis Program remains firm, and we will return to the Moon," Harris tweeted. Veteran NASA astronaut Stan Love told reporters he was disappointed but "not really surprised." "This is a brand new vehicle," Love said. "It has a million parts. All of them have to work perfectly." Extreme temperatures: Overnight operations to fill the orange-and-white rocket with ultra-cold liquid hydrogen and oxygen were briefly delayed by a risk of lightning. A potential leak was detected during the filling of the main stage with hydrogen, causing a pause. After tests, the flow resumed. NASA engineers later detected the engine temperature problem and decided to scrub the launch. The Orion capsule is to orbit the Moon to see if the vessel is safe for people in the near future. At some point, Artemis aims to put a woman and a person of color on the Moon for the first time. During the 42-day trip, Orion will follow an elliptical course around the Moon, coming within 60 miles (100 kilometers) at its closest approach and 40,000 miles at its farthest -- the deepest into space by a craft designed to carry humans. One of the main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built. On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun. Crewed mission to Mars: NASA is expected to spend $93 billion between 2012 and 2025 on the Artemis program, which is already years behind schedule, at a cost of $4.1 billion per launch. The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest. And since humans have already visited the Moon, Artemis has its sights set on another lofty goal: a crewed mission to Mars. The Artemis program aims to establish a lasting human presence on the Moon with an orbiting space station known as Gateway and a base on the surface.Gateway would serve as a staging and refueling station for a voyage to the Red Planet that would take a minimum of several months. Source: https://www.daily-bangladesh.com/
Read More........